At the upcoming BICSI Fall Conference & Exhibition on September 9 – 13 at the Henry B. Gonzáles Convention Center, San Antonio, TX, there are plenty of opportunities to learn about the latest technologies, and Fluke Networks is excited to bring you the latest on testing everything from advanced four-pair PoE to passive optical networks (PONs).

How does Your Fiber Design and Installation Stack Up?

2018-09-06

A wire map test may seem like the most basic test for copper network cabling and therefore one of the least important, but it is actually one of the most critical. And while the pair colors of blue, orange, green and brown might help you pass wire map testing, the test itself really doesn’t care about color at all.

Let’s take a closer look.

2018-08-15

The increasing demand for higher bandwidth to support Big Data has driven the need for ever-increasing Ethernet speeds, starting with 10 Gig in 2004 to the introduction in 2010 of 40 Gig with 4 fibers transmitting and 4 fibers receiving at 10 Gbps (40GBASE-SR4) and 100 Gig with 10 fibers transmitting and 10 fibers receiving at 10 Gbps (100GBASE-SR10).

2018-08-08

Fiber splicing is a method of connecting two fibers, whereby two fibers are precisely cleaved and then aligned and fused using a fusion splicing machine. The fusion of two fibers is achieved by an electric arc that essentially welds the fibers together. A mass fusion splicer welds 12-fiber together at once and is performed using 12-fiber ribbon cable.

2018-08-02

It felt like a Monday morning when the call, actually an e-mail, came in. “I think my DSX is broken!” As you know, they are really tough machines and, when it looks like the Fluke is wrong, usually it isn’t.

“What makes you think it is broken?” I asked, “How does this failure manifest itself?”

“The tester is failing links that used to pass.”

2018-08-01

Verification of test reference cords is easy, right? Yes, usually…but not always. After the power meter is set to 0 dB via the reference procedure, the loss of a mated connector pair is expected to be less than 0.20 dB for single-mode (e.g., -0.20 dB). Let’s examine one scenario where a loss is not negative (e.g., +0.15 dB).

The typical process for validating the loss of a connector, to verify if it is “reference grade” for example, is as follows:

2018-07-25

Depending in which functional area of the data center you are testing, there are different applications, cabling and connectivity that you will encounter. Understanding the functional areas of the data center and what you will likely need to test in each can help prepare you for data center testing.

What Are the Spaces?

2018-07-18

The latest TIA standard for balanced twisted-pair cable systems – TIA 568.2-D – was approved for publication during the TR-42.7 meeting on June 12, 2018. It will replace TIA-568-C.2 and is expected to be published in the coming weeks.

For the past year (or more), we’ve been talking about many of the changes we will see in this standard, and now that it’s approved, we decided a recap is in order.